Cosumnes, American, Bear & Yuba

  • About CABY
    • What is CABY?
    • Who We Are
    • Vision, Principles, Goals, Objectives
    • CABY Region
    • List of Members
    • Governing Documents
    • How to Join
    • Latest News
  • Meetings
    • CABY Stakeholder Group
    • Regional Water Management Group
    • Upcoming Meetings
    • Calendar
  • CABY Plan
  • Projects
    • Project List
    • 2011 Implementation Projects
      • Nevada City
        • Gracie Road Intertie
        • South Pine Street Distribution System Improvement
        • Park Avenue Distribution System Improvement
        • Prospect Street Distribution System Improvement
        • Install Altitude Valves with Integrated SCADA Systems
        • Leak Detection Program
        • Installation of Water Meters on City Facilities
        • NC Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Washington County Water District
        • Maybert Road Transfer and Distribution Line Replacement
        • Relief Hill Road Flow Control Pressure System Improvements
        • Level-Control Altitude Valve Improvements
        • System-Wide Installation of Water Meters
        • Downtown Leak Detection and Repair
        • WA Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Alta and Colfax: Infrastructure Reliability, Conservation and Efficiency
      • CABY Water Trust
    • 2013 Implementation Projects
      • CCSD Water System Improvement
      • City of Placerville Waterline Replacement
      • Lincoln Metering and Hydroelectric Station
      • Water Efficiency, Water Quality and Supply Reliability
      • Wolf Creek Watershed Restoration
      • CABY Mercury and Sediment Abatement Initiative
      • Meadow Restoration, Assessment and Prioritization
    • 2014 Implementation Projects
      • El Dorado County Water Conservation
      • Georgetown Divide Water Conservation, Reliability and Environmental Protection
      • City of Placerville Waterline Replacement 2
      • Greeley Canal Drought Measures Optimization
      • Grizzly Flat Drought Measures Infrastructure
      • Rock Creek Contingency Intertie
    • 2015 Implementation Projects
      • Meade Canal DAC Project
      • Drought Response Disinfection By-Product Reduction Project
  • Grants
  • Resources
  • Document Library
  • Maps
  • Contact Us
You are here: Home / Projects / 2011 Implementation Projects / Nevada City Infrastructure Reliability, Conservation and Efficiency Program / Installation of Water Meters on City Facilities

Installation of Water Meters on City Facilities

The Problem

Nevada City became fully metered in 1979. However, at the time of meter installation, the focus was on residential and commercial meters. Meters were not installed on several of the City facilities and City-owned properties.

The Solution

The City will purchase and install the meters and develop a variety of water conservation opportunities/strategies, including irrigation efficiency. The City will then be able to monitor the effectiveness of the installed improvements and/or strategies.

Current Status (September 2016)

The City purchased the meters in November 2015, with the Installation of Meters on City Facilities project completed in March 2016.

To support meter installation and water management, the City finalized a Meter Installation Plan (MIP) which addressed the size of the required meters, the sequencing of installation, and the process for regular meter reading. The MIP was competed in December 2015 and the meters installed in the first quarter of 2016.

Lead Agency

City of Nevada City

Contact

Catrina Olson, Assistant City Manager, (530) 265-2496 x134, catrinaolson@nevadacity.ca.gov

Measurable Physical Benefits

Water Supply , Water Quality

Watershed

Yuba

County

Nevada

CABY Interactive Map

Click to view the interactive watershed map!

Upcoming Meetings

  • No Events

Recent News

  • 2020 CABY Plan Update Public Workshop
  • CABY’s interactive map is now online!
  • CABY Awarded Implementation Grant

Stay Connected

Contact Us

Copyright © 2023 · Metro Pro Theme on Genesis Framework · WordPress · Log in