Cosumnes, American, Bear & Yuba

  • About CABY
    • What is CABY?
    • Who We Are
    • Vision, Principles, Goals, Objectives
    • CABY Region
    • List of Members
    • Governing Documents
    • How to Join
    • Latest News
  • Meetings
    • CABY Stakeholder Group
    • Regional Water Management Group
    • Upcoming Meetings
    • Calendar
  • CABY Plan
  • Projects
    • Project List
    • 2011 Implementation Projects
      • Nevada City
        • Gracie Road Intertie
        • South Pine Street Distribution System Improvement
        • Park Avenue Distribution System Improvement
        • Prospect Street Distribution System Improvement
        • Install Altitude Valves with Integrated SCADA Systems
        • Leak Detection Program
        • Installation of Water Meters on City Facilities
        • NC Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Washington County Water District
        • Maybert Road Transfer and Distribution Line Replacement
        • Relief Hill Road Flow Control Pressure System Improvements
        • Level-Control Altitude Valve Improvements
        • System-Wide Installation of Water Meters
        • Downtown Leak Detection and Repair
        • WA Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Alta and Colfax: Infrastructure Reliability, Conservation and Efficiency
      • CABY Water Trust
    • 2013 Implementation Projects
      • CCSD Water System Improvement
      • City of Placerville Waterline Replacement
      • Lincoln Metering and Hydroelectric Station
      • Water Efficiency, Water Quality and Supply Reliability
      • Wolf Creek Watershed Restoration
      • CABY Mercury and Sediment Abatement Initiative
      • Meadow Restoration, Assessment and Prioritization
    • 2014 Implementation Projects
      • El Dorado County Water Conservation
      • Georgetown Divide Water Conservation, Reliability and Environmental Protection
      • City of Placerville Waterline Replacement 2
      • Greeley Canal Drought Measures Optimization
      • Grizzly Flat Drought Measures Infrastructure
      • Rock Creek Contingency Intertie
    • 2015 Implementation Projects
      • Meade Canal DAC Project
      • Drought Response Disinfection By-Product Reduction Project
  • Grants
  • Resources
  • Document Library
  • Maps
  • Contact Us
You are here: Home / Meetings / CABY Stakeholder Group

CABY Stakeholder Group

The CABY Stakeholder Group (formerly known as the Planning Committee) is CABY’s main planning and advisory body. Members represent interests and watershed management responsibility within the four watersheds: Cosumnes, American, Bear, and Yuba (CABY). Members participate in quarterly meetings and direct IRWMP-related activities. Members also participate in issue-specific work groups as needed. Entities become members of the CABY Stakeholder Group through adoption of the IRWMP. Click here to see how to join CABY.

CABY Stakeholder Group members represent diverse interests across CABY’s four watersheds, including all four major water purveyors with jurisdiction in the planning area, conservation groups, county representatives, regional representatives, watershed collaborators, small rural water purveyors, recreational/business interests, National Forests, and agricultural representatives. This mix of representatives is intentionally diverse. Click here for a list of current members.

CABY Stakeholder Group meeting materials are available in the Document Library here.

CABY Interactive Map

Click to view the interactive watershed map!

Upcoming Meetings

  • No Events

Recent News

  • 2020 CABY Plan Update Public Workshop
  • CABY’s interactive map is now online!
  • CABY Awarded Implementation Grant

Stay Connected

Contact Us

Copyright © 2023 · Metro Pro Theme on Genesis Framework · WordPress · Log in