Cosumnes, American, Bear & Yuba

  • About CABY
    • What is CABY?
    • Who We Are
    • Vision, Principles, Goals, Objectives
    • CABY Region
    • List of Members
    • Governing Documents
    • How to Join
    • Latest News
  • Meetings
    • CABY Stakeholder Group
    • Regional Water Management Group
    • Upcoming Meetings
    • Calendar
  • CABY Plan
  • Projects
    • Project List
    • 2011 Implementation Projects
      • Nevada City
        • Gracie Road Intertie
        • South Pine Street Distribution System Improvement
        • Park Avenue Distribution System Improvement
        • Prospect Street Distribution System Improvement
        • Install Altitude Valves with Integrated SCADA Systems
        • Leak Detection Program
        • Installation of Water Meters on City Facilities
        • NC Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Washington County Water District
        • Maybert Road Transfer and Distribution Line Replacement
        • Relief Hill Road Flow Control Pressure System Improvements
        • Level-Control Altitude Valve Improvements
        • System-Wide Installation of Water Meters
        • Downtown Leak Detection and Repair
        • WA Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Alta and Colfax: Infrastructure Reliability, Conservation and Efficiency
      • CABY Water Trust
    • 2013 Implementation Projects
      • CCSD Water System Improvement
      • City of Placerville Waterline Replacement
      • Lincoln Metering and Hydroelectric Station
      • Water Efficiency, Water Quality and Supply Reliability
      • Wolf Creek Watershed Restoration
      • CABY Mercury and Sediment Abatement Initiative
      • Meadow Restoration, Assessment and Prioritization
    • 2014 Implementation Projects
      • El Dorado County Water Conservation
      • Georgetown Divide Water Conservation, Reliability and Environmental Protection
      • City of Placerville Waterline Replacement 2
      • Greeley Canal Drought Measures Optimization
      • Grizzly Flat Drought Measures Infrastructure
      • Rock Creek Contingency Intertie
    • 2015 Implementation Projects
      • Meade Canal DAC Project
      • Drought Response Disinfection By-Product Reduction Project
  • Grants
  • Resources
  • Document Library
  • Maps
  • Contact Us

South Fork American River Watershed Plan – 2009

February 11, 2009 by Amber Taxiera

Download
Description

The South Fork American River Watershed Group has been meeting since November 2007 to collaboratively create a watershed plan to guide project decisions and priorities within the watershed for the next 5 years. The watershed plan will be updated on an ongoing 5-year time frame, with periodic edits as needed. Projects may be submitted anytime basis for potential inclusion in the plan during the annual fall update. The plan was finalized in February 2009 and can be downloaded in this section of the website.

Filed Under: Uncategorized

CABY Interactive Map

Click to view the interactive watershed map!

Upcoming Meetings

  • No Events

Recent News

  • 2020 CABY Plan Update Public Workshop
  • CABY’s interactive map is now online!
  • CABY Awarded Implementation Grant

Stay Connected

Contact Us

Copyright © 2023 · Metro Pro Theme on Genesis Framework · WordPress · Log in