Cosumnes, American, Bear & Yuba

  • About CABY
    • What is CABY?
    • Who We Are
    • Vision, Principles, Goals, Objectives
    • CABY Region
    • List of Members
    • Governing Documents
    • How to Join
    • Latest News
  • Meetings
    • CABY Stakeholder Group
    • Regional Water Management Group
    • Upcoming Meetings
    • Calendar
  • CABY Plan
  • Projects
    • Project List
    • 2011 Implementation Projects
      • Nevada City
        • Gracie Road Intertie
        • South Pine Street Distribution System Improvement
        • Park Avenue Distribution System Improvement
        • Prospect Street Distribution System Improvement
        • Install Altitude Valves with Integrated SCADA Systems
        • Leak Detection Program
        • Installation of Water Meters on City Facilities
        • NC Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Washington County Water District
        • Maybert Road Transfer and Distribution Line Replacement
        • Relief Hill Road Flow Control Pressure System Improvements
        • Level-Control Altitude Valve Improvements
        • System-Wide Installation of Water Meters
        • Downtown Leak Detection and Repair
        • WA Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Alta and Colfax: Infrastructure Reliability, Conservation and Efficiency
      • CABY Water Trust
    • 2013 Implementation Projects
      • CCSD Water System Improvement
      • City of Placerville Waterline Replacement
      • Lincoln Metering and Hydroelectric Station
      • Water Efficiency, Water Quality and Supply Reliability
      • Wolf Creek Watershed Restoration
      • CABY Mercury and Sediment Abatement Initiative
      • Meadow Restoration, Assessment and Prioritization
    • 2014 Implementation Projects
      • El Dorado County Water Conservation
      • Georgetown Divide Water Conservation, Reliability and Environmental Protection
      • City of Placerville Waterline Replacement 2
      • Greeley Canal Drought Measures Optimization
      • Grizzly Flat Drought Measures Infrastructure
      • Rock Creek Contingency Intertie
    • 2015 Implementation Projects
      • Meade Canal DAC Project
      • Drought Response Disinfection By-Product Reduction Project
  • Grants
  • Resources
  • Document Library
  • Maps
  • Contact Us

CABY/Nevada City Awarded Prop 84 Implementation Funding

August 24, 2012 by Amber Taxiera

The CABY region with Nevada City as the overall project sponsor was successfully awarded a Proposition 84 Implementation Grant in late 2011. The project application included a variety of projects from four individual CABY stakeholder/member groups: Nevada City (8 projects), Washington County Water District (6 projects), Placer County Water Agency (1 project), and American Rivers (1 project). At the time of submittal, Nevada City, the community of Washington and the community of Colfax were all considered disadvantaged communities with an income of equal to or less than 80% of the median household income of California. Additionally, the community of Washington was and is considered severely disadvantaged with an income of equal to or less than 60% of the median household income of California.

Each of the funded projects will have its own dedicated page within this website as of mid-October 2013. These pages are currently under construction. As the various projects all have different start and end dates, the project-specific pages will be created and updated based on the individual project implementation schedule.

A list of the projects follows organized by sponsor.

Nevada City

1. Gracie Road Intertie

2. South Pine Street Distribution System Improvement

3. Park Avenue Distribution System Improvement

4. Prospect Street Distribution System Improvement

5. Install Altitude Valves with Integrated SCADA Systems on Storage Tanks

6. Leak Detection Program

7. Installation of Water Meters on City Facilities

8. Integrated Water Shortage Contingency, Drought Preparedness

Washington County Water District

1. Maybert Road Transfer and Distribution Line Replacement

2. Relief Hill Road – Flow Control Pressure System Improvements

3. Level-Control Altitude Valve Improvements

4. System-wide Installation of Water Meters

5. Downtown Leak Detection and Repair

6. Comprehensive Water Conservation Planning Program

Placer County Water Agency

1. Leak Detection & Repair in the Communities of Alta/Colfax

American Rivers

1. CABY Water Trust

Click here for detailed work plans.

Filed Under: Latest News

CABY Interactive Map

Click to view the interactive watershed map!

Upcoming Meetings

  • No Events

Recent News

  • 2020 CABY Plan Update Public Workshop
  • CABY’s interactive map is now online!
  • CABY Awarded Implementation Grant

Stay Connected

Contact Us

Copyright © 2023 · Metro Pro Theme on Genesis Framework · WordPress · Log in