Cosumnes, American, Bear & Yuba

  • About CABY
    • What is CABY?
    • Who We Are
    • Vision, Principles, Goals, Objectives
    • CABY Region
    • List of Members
    • Governing Documents
    • How to Join
    • Latest News
  • Meetings
    • CABY Stakeholder Group
    • Regional Water Management Group
    • Upcoming Meetings
    • Calendar
  • CABY Plan
  • Projects
    • Project List
    • 2011 Implementation Projects
      • Nevada City
        • Gracie Road Intertie
        • South Pine Street Distribution System Improvement
        • Park Avenue Distribution System Improvement
        • Prospect Street Distribution System Improvement
        • Install Altitude Valves with Integrated SCADA Systems
        • Leak Detection Program
        • Installation of Water Meters on City Facilities
        • NC Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Washington County Water District
        • Maybert Road Transfer and Distribution Line Replacement
        • Relief Hill Road Flow Control Pressure System Improvements
        • Level-Control Altitude Valve Improvements
        • System-Wide Installation of Water Meters
        • Downtown Leak Detection and Repair
        • WA Integrated Water Shortage Contingency, Drought Preparedness, and Comprehensive Water Conservation Planning Program
      • Alta and Colfax: Infrastructure Reliability, Conservation and Efficiency
      • CABY Water Trust
    • 2013 Implementation Projects
      • CCSD Water System Improvement
      • City of Placerville Waterline Replacement
      • Lincoln Metering and Hydroelectric Station
      • Water Efficiency, Water Quality and Supply Reliability
      • Wolf Creek Watershed Restoration
      • CABY Mercury and Sediment Abatement Initiative
      • Meadow Restoration, Assessment and Prioritization
    • 2014 Implementation Projects
      • El Dorado County Water Conservation
      • Georgetown Divide Water Conservation, Reliability and Environmental Protection
      • City of Placerville Waterline Replacement 2
      • Greeley Canal Drought Measures Optimization
      • Grizzly Flat Drought Measures Infrastructure
      • Rock Creek Contingency Intertie
    • 2015 Implementation Projects
      • Meade Canal DAC Project
      • Drought Response Disinfection By-Product Reduction Project
  • Grants
  • Resources
  • Document Library
  • Maps
  • Contact Us

CABY Region Recommended for Round 2 Implementation Grant Award!

September 26, 2013 by Amber Taxiera

On September 25, 2013, DWR announced their preliminary Round 2 funding recommendations. The CABY region grant, prepared and submitted by The Sierra Fund (as project applicant), included seven projects totaling $8,572,348 with a total request for state fund of $5,543,032. The Sierra Fund application was one of the highest scoring in the state and, if affirmed after public review process, will be the second successful grant for the CABY region from Proposition 84.

The seven projects included in the application and the total funds requested for each project are as follows:

Camptonville Water System Improvement Project: $789,341

City of Placerville Waterline Replacement: $950,000

El Dorado County Small Hydro Development Program: $380,000

Water Efficiency, Water Quality, and Supply Reliability in the CABY Region: $997,500

Wolf Creek Watershed: Restoration, Stormwater Source Control, and Flood Management: $342,499

CABY Mercury and Sediment Abatement Initiative: $1,498,524

Meadow Restoration, Assessment and Prioritization in the American, Bear, and Yuba Watersheds: $308,016

Filed Under: Latest News

CABY Interactive Map

Click to view the interactive watershed map!

Upcoming Meetings

  • No Events

Recent News

  • 2020 CABY Plan Update Public Workshop
  • CABY’s interactive map is now online!
  • CABY Awarded Implementation Grant

Stay Connected

Contact Us

Copyright © 2023 · Metro Pro Theme on Genesis Framework · WordPress · Log in